PUE 2.3: 6–10 kV cable installation, 1 m burial depth, joints, HV testing.
| Document | PUE 7, Chapter 2.3 HV cable lines |
| Edition | 2002 (ПУЭ-7, гл. 2.3) |
| Status | Current |
| Issued by | Ministry of Energy of Russia |
| Applies to | Cable lines above 1 kV (6–10 kV intakes, feeders) |
| № | Chapter / section |
|---|---|
| 2.3.1–2.3.15 | General |
| 2.3.16–2.3.27 | Underground installation |
| 2.3.28–2.3.40 | Ducts, tunnels, blocks |
| 2.3.41–2.3.66 | Racks, buildings, joints |
| 2.3.67–2.3.120 | Crossings, testing, marking |
Depth ≥ 1 m for >1 kV (0.7 m for LV); 100 mm between cables; 2 m to heat pipes.
Joints only with splicing kits; HV withstand test after installation.
Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.
Start freeData is for reference. Final design decisions must follow current regulations and a qualified engineer.