JGJ 16-2008 Electrical design of civil buildings — translation

Clause-by-clause translation of the Chinese industry standard JGJ 16-2008: load categories, earthing systems, 30 mA RCDs, circuit protection, bathroom zones, lightning protection.

🇷🇺 PUE — Rules for Electrical Installations (7th ed.)🕰️ PUE-6 — Rules for Electrical Installations (6th ed., 1985)🇺🇸 NEC — National Electrical Code (NFPA 70)🇪🇺 IEC 60364 / HD 60364 (EU national codes)🌎 NOM-001-SEDE, NBR 5410, AEA 90364, RETIE, NCh 4, CNE🇨🇳 GB 50054, GB 50303, JGJ 16, GB/T 16895 (IEC 60364)🇮🇳 IS 732

Document

DocumentJGJ 16-2008 Electrical design of civil buildings
Edition2008
StatusCurrent (industry, JGJ)
Issued byMinistry of Construction of China, in force since 1 August 2008
Applies toElectrical design of residential and public buildings (flats, schools, hospitals, offices)

Document structure

№Chapter / section
1General provisions
2Terms
3Supply systems
4Distribution substations
5Protection and metering
6Emergency power sources
7Low-voltage distribution
8Wiring systems
9General electrical equipment
10Electric lighting
11Lightning protection
12Earthing and special locations
13Fire alarm systems
14–23Low-current and IT systems
DAnnex D — bathroom zones
GB 50054-2011 Code for design of low-voltage electrical installationsGB 50303-2015 Acceptance of building electrical worksJGJ 16-2008 Electrical design of civil buildingsGB 50096-2011 Residential design code, section 8GB 50057-2010 Building lightning protection codeGB 51348-2019 Civil buildings electrical design standardGB 50168-2018 Cable line installationGB 50052-2009 Supply reliability (China)GB 50058-2014 Explosive atmospheres (China)

Overview

JGJ 16-2008 (民用建筑电气设计规范) — the main design code for residential and public buildings in China, in force since 1 August 2008. Covers supply systems, substations, LV distribution, lighting, lightning protection, fire alarm and safety.

Chapter 3. Supply systems

3.2 Load categories: category 1 (fire systems, hospitals, critical facilities) — two independent supplies with automatic transfer; category 2 — two lines; category 3 — single supply.

Chapter 7. LV distribution

7.2 Earthing: TN-S / TN-C-S for buildings, PEN split at the intake.

7.5.2 In TN-C the PEN must never be opened; no devices may break PEN.

7.7.9 Protective devices: overcurrent devices in TN; RCDs allowed in TN-S/TN-C-S (PE upstream of the RCD); RCDs forbidden in TN-C; TT — RCD or overcurrent; IT — insulation monitoring.

7.7.10 Mandatory RCDs for: handheld and mobile equipment; outdoor equipment; wet/aggressive environments; household and socket circuits; TT-supplied equipment; medical equipment (alarm for surgery). Trip current ≤ 30 mA for shock protection, ≤ 500 mA for wiring earth faults. PE must not pass through the RCD core. Multi-level RCDs — selective. RCD opens all live conductors.

7.7.8 IT second fault: 0.8 s (with N) / 0.4 s (without N) at 220/380 V.

Chapter 8. Wiring systems

8.1.5 Plastic conduits must be flame-retardant.

8.1.6 In RC slabs, conduit OD ≤ 1/3 of slab thickness.

8.1.8 Fire sealing at compartment crossings.

Chapter 10. Lighting

10.5 Illuminance levels (annex B): living rooms 100–300 lx, kitchens 150–300 lx, offices 300–500 lx, classrooms 300 lx.

10.7 Emergency lighting on escape routes with ≥ 30 min autonomy.

Chapter 12. Earthing and special locations

12.2 Earthing: TN — per calculation; TT — RA×Ia ≤ 50 V.

12.8 Medical rooms: IT systems for operating theatres, insulation monitoring.

Annex D — bathroom zones 0–3 (as IEC 60364-7-701): SELV or 30 mA RCD protection in zones 1–2.

Chapter 13. Fire alarm

13.12 Residual-current fire alarm system mandatory for top-category buildings.

13.8–13.9 Emergency lighting and fire-system supply at category-1 reliability.

Practical takeaways

JGJ 16-2008 is close to PUE 7.1 + SP 256: 30 mA RCDs on sockets, TN-C-S with PEN split at the intake, RCD forbidden in TN-C, selectivity, bathroom zones. Chinese specifics: reliability categories 1–3, RCD ≤ 500 mA for fire protection.

Design with GorkyCAD Pro

Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.

Start free

Data is for reference. Final design decisions must follow current regulations and a qualified engineer.
← Back to the country: China: electrical installation rules (GB 50054, GB 50303, JGJ 16) · World electrical installation rules