GB 50303-2015 Acceptance of building electrical works — translation

Clause-by-clause translation of GB 50303-2015: incoming inspection, switchboard, conduit, cable and luminaire installation, insulation testing, earthing, lightning protection.

🇷🇺 PUE — Rules for Electrical Installations (7th ed.)🕰️ PUE-6 — Rules for Electrical Installations (6th ed., 1985)🇺🇸 NEC — National Electrical Code (NFPA 70)🇪🇺 IEC 60364 / HD 60364 (EU national codes)🌎 NOM-001-SEDE, NBR 5410, AEA 90364, RETIE, NCh 4, CNE🇨🇳 GB 50054, GB 50303, JGJ 16, GB/T 16895 (IEC 60364)🇮🇳 IS 732

Document

DocumentGB 50303-2015 Acceptance of building electrical works
Edition2015
StatusCurrent (mandatory, GB)
Issued byMOHURD China, in force since 1 August 2016
Applies toAcceptance of building electrical installation quality up to 35 kV

Document structure

№Chapter / section
1General provisions
2Terms and symbols
3Basic requirements
4Transformers and box-type substations
5Switchboards and panels
6Motors and heaters
7Diesel generators
8UPS and EPS
9Testing and trial run
10Busway
11Ladders, trays and trunking
12Conduit installation
13Cable installation
14Wiring in conduits
15Sheathed-cable direct wiring
16Steel-cable wiring
17Terminations, connections, insulation tests
18Luminaire installation
19Special luminaires
20Switches, sockets, fans
21Lighting trial operation
22Earthing installations
23Earthing busbars in substations
24Air terminals and down conductors
25Building equipotential bonding
GB 50054-2011 Code for design of low-voltage electrical installationsGB 50303-2015 Acceptance of building electrical worksJGJ 16-2008 Electrical design of civil buildingsGB 50096-2011 Residential design code, section 8GB 50057-2010 Building lightning protection codeGB 51348-2019 Civil buildings electrical design standardGB 50168-2018 Cable line installationGB 50052-2009 Supply reliability (China)GB 50058-2014 Explosive atmospheres (China)

Overview

GB 50303-2015 in force since 1 August 2016, applies to building electrical installations up to 35 kV. 25 chapters + 8 annexes. Every chapter has mandatory items (主控项目) and general items (一般项目).

Chapter 3. Basic requirements

3.1 Work per approved design; only accepted equipment allowed.

3.2 Incoming inspection: CCC certificates, appearance, completeness, factory test reports.

3.3 Stage handover confirmation, including concealed works with acts.

3.4 Acceptance by divisions; quality graded qualified/unqualified.

Chapter 5. Switchboards and panels

Plumb and rigid mounting; row alignment; enclosure and door-frame earthing (bonding jumpers); contact joints; circuit and device marking; torque per annex E; IP class per room conditions.

Chapters 12–14, 17. Conduit, cables, wiring, testing

12 Conduit bending radius ≥ 6×OD (10×OD hand bending); threaded/compression joints; glands at boxes; metallic conduit earthing.

13 Cable bending radii per cable type; labeling at ends; fixing spacing for vertical runs.

14 Conduit fill ≤ 40%; splices only in boxes; phase/neutral/PE marking.

17 Insulation resistance after installation: ≥ 0.5 MΩ for LV circuits; joints by soldering/crimping/screw terminals.

Chapters 18–21. Luminaires, sockets, trial run

18 Luminaires fixed to load-bearing structures; no hanging on conductors; separate anchors above 3 kg.

20 Installation heights per design; socket earth contact to PE; no phase-neutral jumper inside socket; bathroom sockets on RCD-protected circuits.

21 Trial run of all lighting circuits — continuous operation (≥ 24 h for residential/public buildings) with current/voltage measurements.

Chapters 22–25. Earthing, lightning, bonding

22 Earth electrodes and loop, welded joints checked, earth resistance measured.

23 Earthing busbars: green-yellow marking, continuity.

24 Air terminals and down conductors: continuity tests, welded/special clamps.

25 Equipotential bonding integrity, transition resistance checks.

Practical takeaways

GB 50303-2015 is the Chinese equivalent of acceptance norms (PUE ch. 1.8 / SP 76.13330): incoming inspection, concealed works acts, 0.5 MΩ insulation test, 24 h lighting trial. The difference: strict formalization — every step documented.

Design with GorkyCAD Pro

Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.

Start free

Data is for reference. Final design decisions must follow current regulations and a qualified engineer.
← Back to the country: China: electrical installation rules (GB 50054, GB 50303, JGJ 16) · World electrical installation rules