GB 50168-2018: installation methods, bending radii, testing after installation.
| Document | GB 50168-2018 Cable line installation |
| Edition | 2018 |
| Status | Current (mandatory, GB) |
| Issued by | MOHURD China |
| Applies to | Cable line installation and acceptance: underground, conduit, tunnels, bridges |
| № | Chapter / section |
|---|---|
| 1–3 | General, preparation |
| 4 | Conduit and duct installation |
| 5 | Tunnel and shaft installation |
| 6 | Underground installation |
| 7 | Bridge and rack installation |
| 8–9 | Joints, testing |
Conduit ID ≥ 1.5 × cable OD; bending radii 10–15×OD; underground depth ≥ 0.7 m (1 m roads), sand bed, plates.
Splicing kits per manufacturer; insulation ≥ 0.5 MΩ for LV lines; protocols.
Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.
Start freeData is for reference. Final design decisions must follow current regulations and a qualified engineer.
← Back to the country: China: electrical installation rules (GB 50054, GB 50303, JGJ 16) · World electrical installation rules