Commercial
Electrical Switchboard for an Office Center
📊 Project Specifications
📐
340 m²
Area
🚪
12
Offices
85
Outlets
〰️
24
Circuits
⚡
2
Panels
⏱️
6 h
Project Time
🎯 Task
Design the electrical supply for an office center with a server room, air conditioning, and workstations. Separation into power and IT networks was required.
💡 Solution
The designer used GorkyCAD to create two independent schematics. Voltage drop calculation showed the need to increase cable cross-section to the server room. Automatic RCD selection saved 2 hours.
✅ Result
- • Main switchboard and floor panel schematic
- • Power outlet plan
- • IT outlet plan
- • Phase load calculation
- • Specification (BOM) — all in PDF
Frequently asked questions
Is this article free?
Yes, all articles and calculators are completely free.
Yes, all articles and calculators are completely free.
Where can I run calculations?
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
How do I prepare an electrical project?
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Found an error in the article?
Write to hello@gorkycad.pro — specialists will review and correct it.
Write to hello@gorkycad.pro — specialists will review and correct it.