Three-Phase Supply for a House

Integrating pulse-output meters into your design. Connection diagrams, CT selection, AMR system based on GorkyCAD.

Author: GorkyCAD Team

When needed

Above 7-8 kW of calculated load: electric heating, sauna, 3-phase equipment, EV fast charging. 15 kW — standard three-phase input.

What changes

Input cable 5×6 or 5×10 mm²; a 3-phase meter; a 3P/4P breaker; groups are distributed across phases.

Balancing

Single-phase groups spread evenly: 9 groups → 3/3/3. The imbalance above 15% overheats the neutral.

Voltage 380 or 400?

Nominal 400 V (linear). Equipment is marked 230/400 V. In old networks — 380 V.

Cost

Three-phase connection is not much more expensive than single-phase (standard 550 ₽ up to 15 kW in RF); the meter and the cable are more expensive.

Why design

The project shows the phase distribution, the cable and the metering — the input is done per the TC without rework.

Frequently asked questions

Is this article free?
Yes, all articles and calculators are completely free.
Where can I run calculations?
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
How do I prepare an electrical project?
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Found an error in the article?
Write to hello@gorkycad.pro — specialists will review and correct it.

Open free calculators →

Related tools

Open free calculators →