Why automate metering
Automated Meter Reading (AMR) systems are mandatory for new residential buildings and industrial facilities. Pulse-output meters are the most accessible integration method.
Connection diagram
A pulse-output meter connects to a data concentrator (DCU). The pulse output is a dry contact or optocoupler closing N times per kWh. Standard values: 100, 500, 1000, 5000 imp/kWh.
CT selection
For loads above 100 A, current transformers (CTs) are used. Accuracy class for revenue metering: 0.5S or 0.2S. Secondary rating: 5 A (standard) or 1 A (for long runs).
GorkyCAD and AMR
GorkyCAD automatically adds meters and CTs to the single-line diagram when the "Revenue Metering" option is enabled. The BOM includes all metering node equipment.
Frequently asked questions
Yes, all articles and calculators are completely free.
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Write to hello@gorkycad.pro — specialists will review and correct it.