Renovation Order — When Electrical Work Happens

Integrating pulse-output meters into your design. Connection diagrams, CT selection, AMR system based on GorkyCAD.

Author: GorkyCAD Team

Stage 1 — rough

Before plastering: chasing, cable laying, boxes, panel, grounding. Result: walls ready for plastering, wires in the boxes.

Stage 2 — finishing

After the finish: sockets, switches, lights, panel assembly, testing. Result: working electrical system.

When the panel is installed

Rough stage — the panel body with the input; the devices — at the finish, after the walls are clean.

What to do in advance

The project with the socket positions — BEFORE the chasing. Materials — per the specification, before the rough stage.

Typical mistakes

Chasing without a project — rework; plastered sockets at the wrong height; no project for the inspector — redone in a month.

Why a project first

The project fixes the sockets before the walls close. Changing a socket after the wallpaper is 100 times more expensive.

Frequently asked questions

Is this article free?
Yes, all articles and calculators are completely free.
Where can I run calculations?
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
How do I prepare an electrical project?
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Found an error in the article?
Write to hello@gorkycad.pro — specialists will review and correct it.

Open free calculators →

Related tools

Open free calculators →