Dedicated circuits
Oven — own circuit (3-4 kW → 2.5-4 mm², C20-C25). Hob — own (7 kW → 6 mm², C32). Washer + dishwasher — separate circuits. Each with RCD 30 mA.
Socket planning
10+ sockets: work zone above the counter (every 60 cm), for appliances (fridge, microwave, hood, kettle), dining zone. In the cabinet — for dishwasher and washing machine.
Lighting layers
General light, work zone under the upper cabinets, hood lighting, dining pendant. Scenes are convenient: work/guest.
Ventilation
Hood — power and control circuit; range hoods with motor need a dedicated circuit.
Water safety
Sockets above the sink — no; RCD 10 mA near water; all work zone sockets — with shutters.
Why a project
Rewiring a kitchen after the cabinets are installed is impossible. The project fixes the sockets at the right heights before the walls close.
Frequently asked questions
Yes, all articles and calculators are completely free.
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Write to hello@gorkycad.pro — specialists will review and correct it.