--- Skip to content
Design 2025-06-08 · 8 min

Electrical Testing — What Is Measured

Integrating pulse-output meters into your design. Connection diagrams, CT selection, AMR system based on GorkyCAD.

Author: GorkyCAD Team

Insulation resistance

Measured with a megohmmeter at 500/1000 V between L-N, L-PE, N-PE. Norm: ≥ 0.5 MΩ (new wiring usually shows 100+ MΩ).

RCD test

The RCD must trip: at the rated current — within 0.3 s, at 5×Idn — instantly. Tested with a special device or the «T» button + measurement.

Grounding

PE continuity — every socket: resistance ≤ 0.1 Ω for the loop; ground loop resistance ≤ 4 Ω (TN) / ≤ 30 Ω (TT).

Phase/neutral check

Polarity and absence of voltage on PE — checked by load and phase rotation.

The protocol

Name, dates, devices, measured values, conclusion. Signed by the contractor and the customer — part of the acceptance documents.

How GorkyCAD helps

The protocol template and the list of lines to test are generated from the model — the electrician fills in the numbers.

Frequently asked questions

Is this article free?
Yes, all articles and calculators are completely free.
Where can I run calculations?
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
How do I prepare an electrical project?
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Found an error in the article?
Write to hello@gorkycad.pro — specialists will review and correct it.

Open free calculators →

Related tools

Open free calculators →