Input changes
Increasing the allocated power, changing the input — only through the network organization: application, TC, contract.
Metering
The metering panel location and the meter type — per the TC; the meter is sealed by the network owner.
Public buildings
Projects for offices, malls, schools — undergo design approval (expertise for large facilities).
Industrial
Fault levels, relay protection settings, electrical safety — coordinated with the system operator.
Who coordinates
Network organization (input), design expert (project), fire inspector (safety systems).